Major Steps Involved in
Retro-Commissioning
:


Benchmark energy use

  • Review utility bills
  • Compare energy usage with similar buildings

Site Investigation

  • Review HVAC, lighting and other energy-consuming systems
  • Monitor energy usage with meters
  • System performance testing

Identify energy conservation measures

  • Catalog all potential measures
  • Determine life cycle costs (payback)
  • Prioritize measures

Implement measures

  • Work with engineers and/or contractors to prepare construction documents
  • System verification
  • Operation and warranty reviews