 |
 |
Major Steps Involved in
Retro-Commissioning:
Benchmark energy use
- Review utility bills
- Compare energy usage with similar buildings
Site Investigation
- Review HVAC, lighting and other energy-consuming systems
- Monitor energy usage with meters
- System performance testing
Identify energy conservation measures
- Catalog all potential measures
- Determine life cycle costs (payback)
- Prioritize measures
Implement measures
- Work with engineers and/or contractors to prepare construction documents
- System verification
- Operation and warranty reviews
|
 |