Steps that we take during the Commissioning process include :

 

 

 

Planning phase

  • Document Owner's Project Requirement (OPR)
  • Develop commissioning plan
  • Specify Architect/Engineer commissioning requirements
  • Assist with the A/E selection process

Design phase

  • Participate in design team meetings
  • Verify that the design meets the OPR
  • Write commissioning specifications

Construction phase

  • Verify that the submittals meet the OPR
  • Verify that the installation meets OPR
  • Verify that the components function as required

Acceptance phase

  • Verify that the systems meet OPR
  • Verify that the OPR is met throughout the Building
  • Review O&M/systems manual

Operational phase

  • Warranty Review
  • Verify that the operation of the building is optimal