Steps that we take during the Commissioning process include :
Planning phase
- Document Owner's Project Requirement (OPR)
- Develop commissioning plan
- Specify Architect/Engineer commissioning requirements
- Assist with the A/E selection process
Design phase
- Participate in design team meetings
- Verify that the design meets the OPR
- Write commissioning specifications
Construction phase
- Verify that the submittals meet the OPR
- Verify that the installation meets OPR
- Verify that the components function as required
Acceptance phase
- Verify that the systems meet OPR
- Verify that the OPR is met throughout the Building
- Review O&M/systems manual
Operational phase
- Warranty Review
- Verify that the operation of the building is optimal
|
 |