July 8, 2002
Sent via Certified US Mail and Sent via Email to: chan.kwai@epamail.gov
Kwai Chan
Assistant Inspector General
Office of Inspector General
U.S. Environmental Protection Agency
1200 Pennsylvania Av. (Mail Code 2460T)
Washington, DC 20460
Dear Mr. Chan,
As you know, EPA Region 10 announced in the Federal Register (7/1/02) its final ruling that grants the State of Idaho’s Department of Environmental Quality (IDEQ) permanent RCRA enforcement authorization. Region 10 also sent a letter (WCM-122) on the same day to Petitioners Keep Yellowstone Nuclear Free (KYNF), Environmental Defense Institute (EDI), and David McCoy (collectively “Petitioners”) without the attachments A and B. Given that EPA’s Office of Inspector General is continuing to investigate Petitioners allegations of violation of environmental law and non-enforcement by both IDEQ and EPA Region 10, we feel compelled to respond to Regional Administrator L.J. Iani’s letter.
Many of the same issues and concerns were raised in Petitioners’ 4/2/02 Rebuttal to EPA Region 10. The reason for that is that neither the Idaho Department of Environmental Quality (IDEQ) nor the EPA dealt with those issues in true, accurate and complete fashion in their Responses. For the most part IDEQ and EPA still refuse to address the same issues and concerns in a fashion that can explain the operation of numerous hazardous waste management facilities at the Idaho Nuclear Technology Center (INTEC) at the Idaho National Engineering and Environmental Laboratory (INEEL) for over a decade without RCRA permits with imminent and substantial endangerment of the public health and the environment.[1]
It is common for a bureaucratic agency such as IDEQ or EPA to attempt to avoid any appearance of wrongdoing or malfeasance in failing to comply with the law. The purpose of obtaining RCRA permits is to protect the public and the environment. IDEQ has failed to timely call in RCRA Part B applications, force closure of non-compliant operations and EPA has failed to exert oversight of IDEQ to make sure Part B applications are called in or that closures occur. Hazardous waste treatment, storage, and disposal operations that continue at INEEL without permits and claims of interim status for numerous INTEC facilities have been and are legally unjustifiable.
EPA makes numerous statements in its 7/1/02 letter which, in substance, confirm several allegations of Petitioners. EPA nevertheless chooses to continue to draw the conclusion that IDEQ is competent to continue to manage the Hazardous Waste Management program in Idaho. EPA issues Federal Register approval for IDEQ in spite of the fact that it cannot resolve the concerns and issues raised by Petitioners regarding IDEQ lack of permitting and lack of EPA oversight. EPA issued the Federal Register approval while it set forth new responses (discussed below) to Petitioners before EPA allowed Petitioners to respond.
EPA could better serve the public by an open admission of the historic and ongoing shortcomings of EPA and IDEQ, their failure to call for RCRA Part B applications, failure to demand stand down during the lack of RCRA permits for extremely dangerous hazardous waste operations, and the use of improper facilities to process the types of wastes that are being processed. EPA refuses to discuss or admit the fact that the INTEC facilities processing hazardous waste have been and are sending RCRA hazardous wastes to other RCRA nonpermitted facilities. EPA and IDEQ prefer instead to allow the public to be exposed to the toxic wastes from illegally operating hazardous waste facilities.
When Petitioners ask, “Where are the permits?” EPA and IDEQ pretend that interim status is a substitute for a permit [2] although RCRA requires permitted facilities during their operational lifetimes. [3] Interim status operations have continued for longer periods than permitted operations could have continued. [4] 42 U.S.C. §6925 reflects Congressional intent to limit interim status operations. One only has to read the Rebuttal submitted by Petitioners to realize the large number of legal and factual issues which the EPA has refused to acknowledge or address in its 7/1/02 letter or EPA’s earlier Response.
EPA admits that Petitioners were correct about the Howell memorandum, which involved a tank system unrelated to the High Level Liquid Waste Evaporator (HLLWE). The memorandum provided no legal basis for EPA’s claim of interim status for the HLLWE. The Howell memorandum (Attachment H- EPA 3/20/02 Response) was the sole basis upon which EPA relied in its Response to Petitioner’s to assert that the High Level Liquid Waste Evaporator (HLLWE) was “in existence” as a legal basis for claiming interim status for the HLLWE.[5] The prerequisite for obtaining interim status was that the facility had to be “in existence” by July 3, 1986. 40 CFR 270.2 .[6]
Now, three months later, giving Petitioners no opportunity for reply prior to the Federal Register decision, EPA makes a new argument that the HLLWE was a “replacement unit” for the Waste Calcining Facility (“WCF”) evaporator located in building CPP-633. The HLLWE is part of a different facility, the New Waste Calcining Facility (“NWCF”) located in building CPP-659 which is hundreds of feet to the north.
This new IDEQ/EPA attempt to justify the lack of a permit for the HLLWE trumps even the absurdity of the argument based on the Howell memorandum. EPA now ignores the requirements of the Code of Federal Regulations that a facility, to be replaced, must have interim status when the change takes place.
In this incorrect argument to show HLLWE interim status based on replacement, EPA states that “the Director can approve addition of new units at a facility to increase the capacity of a process already in operation at the facility.” EPA ignores the legal fact that 40 CFR 270.72(a) only addresses and allows changes for a facility which has obtained interim status. Without a Part A that has been approved by the permitting authority, no interim status exists for a facility. Interim status did not exist for the WCF-114 facility when the HLLWE unit was claimed to be a replacement for the WCF-114 evaporator. EPA presents no evidence that the 1988 Part A Application submittal for the WCF-114 evaporator was ever complete or approved so as to provide interim status for the WCF-114 evaporator. The WCF-114 evaporator was also nonoperational in 1987, according to the EPA. (7/1/02 EPA letter, p.2, fn.1).
The mere submission by the Department of Energy (“DOE”) of a Part A application which did not receive approval does/did not confer interim status on the WCF-114 evaporator. EPA has presented no legal authority to substantiate the claim that interim status could be gained for the HLLWE as a replacement for the WCF-114 evaporator which had not received Part A approval and thus lacked interim status.[7]
EPA argues that in 1990, the DOE submitted a Part A application for the ETS (HLLWE) as a replacement for the existing WCF-114 evaporator.[8] In 1990, at the time of the RCRA Part A submission for the HLLWE, the WCF-114 did not have interim status because there still had been no approval of a Part A application for the WCF-114. Section 270.72(a)(2) does not allow for additions of new units to facilities which are not in compliance with RCRA. Nevertheless, EPA apparently now is asserting that facilities, such as the WCF-114, which lack interim status and do not submit timely Part B applications, are somehow eligible for replacement.
In 1988 and in 1990, the HLLWE could not legitimately be considered as a replacement for the WCF-114 evaporator which had not obtained interim status because WCF-114 lacked an approved Part A. Even if EPA wants to continue the argument, which has no basis in law, that the HLLWE was an interim facility, the HLLWE was still required to submit a RCRA Part B application to obtain a permit. The HLLWE never has submitted a RCRA Part B application within the necessary deadline established by Congress, or at any time.
In order for a final determination to be made as to whether a RCRA permit will issue for a facility such as the HLLWE, a RCRA Part B Application must have been submitted for consideration within the statutory time line. The HLLWE failed to qualify for interim status after 1992 because no RCRA Part B application was filed for the HLLWE upon which to make a final determination. The final permit or final denial of an application was to have been issued by 1992 for interim status facilities. 42 U.S.C. §6925 (c)(2)(B).
EPA Region 10 interprets 40 CFR 270.1(a)(3)(b) to mean that interim status can be treated as a permit until final determination of a Part B application. EPA Region 10 tries to use this as a justification for an indefinite period of operations for hazardous waste management units at INEEL. However, there is no authority in 40 CFR 270.1 or elsewhere that the final determination can be extended past the Congressionally mandated date of November 8, 1992. EPA’s interpretation of Section 270.1 would defeat the statutory purpose of RCRA that hazardous waste management facilities require RCRA permits. EPA’s interpretation is also counter to the language of Section 270.1(c) requiring owners and operators of hazardous waste management units to have permits during the active life of the unit. Moreover, the language of 40 CFR 124.2 and 270.2 explicitly provide that interim status is not a permit. EPA’s interpretation of unlimited time for operation under interim status makes no sense when viewed from the perspective that a permitted operation cannot exceed 10 years without a comprehensive review and renewal process to ensure all current operations comply with current regulations. 42 U.S.C. §6925 is preemptive of EPA’s self serving interpretation of interim status. [9]
The EPA has not shown that compliance with the other sections of 40 CFR 270.72 was met for the HLLWE as a replacement for the WCF-114:
$ EPA did not consider whether increases in design capacity were approved by the Director for reasons listed in Section 270.72(a)(2)(i) and (ii) [lack of available treatment storage or capacity at other hazardous waste management facilities, or the change is necessary to comply with a Federal, State or local requirement.
$ EPA did not consider whether changes in the processes for treatment, storage, or disposal in relation to the necessity to prevent a threat to human health and the environment or to comply with Federal, State or local law. 40 CFR 270.72(a)(3)(i) and (ii).
$ EPA did not consider whether the amount of reconstruction costs for the HLLWE in comparison to the costs for the WCF-114 exceeded 50% of the capital costs for the WCF-114.
$ The 3/19/91 letter of Richard P. Donovan, Director of the State of Idaho Department of Health and Welfare Division of Environmental Quality to Mr. Wilmot, U.S. DOE, approving the RCRA Part A application does not even reference 40 CFR 270.72, much less make the findings required under that section.
$ The 1990 Part A Application does not reference replacement under 40 CFR 270.72, nor does the document make the findings necessary for replacement under that section.
EPA’s replacement argument for the HLLWE does not explain the failure of IDEQ and EPA to require DOE to obtain a RCRA permit for the HLLWE. EPA has not provided, under the 1986 mixed waste rule, the 1988 Clarification Notice, or any other rule, any extension date for a regulatory change or a replacement facility that differs from the Congressionally mandated November 8, 1992 deadline for submission of a RCRA Part B for facilities that became subject to the 1986 mixed waste rule. 40 CFR 270.10 (e)(4) provides that any owner or operator of a hazardous waste management facility must submit a Part B permit application in accordance with the dates specified in 40 CFR 270.73. See, 40 CFR 270.73(g) giving the termination date of November 8, 1992 for interim status for any facility (other than a land disposal facility) that has not submitted a Part B. The failure of DOE to furnish in full any information by a Part B application was grounds for termination of interim status claimed for the HLLWE. 40 CFR 270.10(e)(5). Thus, after November 8, 1992, interim status no longer existed for the HLLWE because no RCRA Part B application was filed for the HLLWE.
IDEQ/EPA’s interim status argument for the HLLWE based on being a replacement for the WCF-114, is also questionable for other reasons:
1.) The HLLWE is a unit in the New Waste Calcining Facility (“NWCF”- in building CPP-659), which needed a RCRA permit as a different facility from the Waste Calcining Facility (“WCF”). The WCF-114 evaporator was in a different facility located in a different building complex (CPP-633) from the HLLWE (located in CPP-659). The NWCF never obtained a RCRA permit after decades of operations because it could not comply with RCRA or Clean Air Act Maximum Achievable Control Technology (MACT) requirements.
2.) The HLLWE was only a proposed facility and DOE failed to include the HLLWE as part of the October 1991 Part B Application Volume 6 which stated: “This permit application addresses all units within the confines of the NWCF that appear on the current version of the INEL Part A permit Application, with the exceptions of the HEPA Filter Leaching Facility, the High-level Liquid Waste Evaporator, and the Evaporator Tank System.” “CPP-659 NWCF Evaporator (proposed) 5,400 gal/day.” (Emphasis supplied).
3.) The HLLWE was not part of or associated with any process located at the Waste Calcining Facility (CPP-633) where the WCF-114 evaporator was located. The HLLWE was configured and associated with a very different number of tanks, fractionators and an incinerator (the Calciner) at the New Waste Calcine Facility (NWCF). Construction for the HLLWE did not begin until 1993 and operation did not begin until 1996.
4.) The November 1988 DOE Workplan to Revise the RCRA Part B Permit Application for the INEEL, p. 5, Table 1, listed the HLLWE “to be added” as a “new unit.” The 1988 Workplan categorized the HLLWE as a new facility rather than an interim status facility.
5.) Currently, DOE is claiming that a Modification will be made to the INEEL Liquid Waste Management System (ILWMS) permit for the HLLWE. If the HLLWE constitutes a modification now, why was it not also considered to be a modification to the NWCF in 1993? No modification was ever applied for by DOE for the NWCF and the addition of the HLLWE. So the issue is raised: why wasn’t the HLLWE considered a Modification to the NWCF when and where it was built, and why have the regulators allowed HLLWE and other NWCF operations to continue for seven years without requiring an application for a Modification? Why does EPA continue to ignore IDEQ’s failure to call in the application? In light of the fact that the HLLWE is purportedly a modification to the NWCF or the ILWMS, the claim that it was a replacement for the WCF-114 evaporator is a failure in permitting logic. (Petitioners allege that the HLLWE is a new facility and must have a full RCRA permit.)
Idaho DEQ has recognized, given lip service to, but not enforced the provision that RCRA facilities are prohibited from discharging RCRA wastes to nonpermitted facilities. The minutes of the March 2 and 3, 1998 RCRA Quarterly Meeting between IDEQ and DOE state (p.3) for the ICPP/LET&D/PEW/NWCF: “It was also stated that the DEQ will not grant a permit for units (such as the HLWE) that discharge to a non-permittable facility.” (Emphasis supplied).
The HLLWE sends mixed radioactive/hazardous RCRA waste to other nonpermitted INEEL facilities at INTEC that include: the Process Waste Equipment Evaporator (“PEWE”) and the Liquid Effluent and Disposal Facility (“LET&D”), the Tank Farm Facility, the Service Waste Water System, and the Percolation Ponds. The wastes are transfered by piping that is not RCRA compliant. The HLLWE sent liquid waste to the New Waste Calcine Facility incinerator which is currently in stand-down mode. The NWCF Calciner, which is a high-level nuclear waste incinerator, never obtained a RCRA permit. Interim status does not constitute a permit and hazardous waste management facilities are required to have permits during their operational lifetimes.[10]
EPA continues to ignore Petitioner’s legal issue that the RCRA Expanded Public Participation Rule and the Flood plains/Wetlands requirements of 10 CFR 1022 require the DOE to give early notice (including Federal Register notice under 10 CFR 1022 et seq.) and opportunity for the public to participate in the proposed action for the HLLWE. Although all proposed actions at INTEC lie within the 100-year floodplain 10 CFR 1022 requirements are ignored with impunity by DOE, IDEQ and EPA.
EPA ignores the lack of National Environmental Policy Act (NEPA) concerns raised by Petitioners and the lack of comprehensive environmental statement to consider the numerous facilities that are being reconfigured, the alternatives, cost comparisons, etc.
EPA admits that Petitioners were correct that the Attachment for the Liquid Effluent Treatment & Disposal (“LET&D”) facility was a request for funding and not an appropriation. DOE/IDEQ/EPA thus had no legal basis to claim that contractual obligations for interim status purposes existed for the LET&D. The letter of EPA Region 10 Chief Feigner to DOE Hanford did not address or apply to the INEEL facility. Nor did the letter resolve the problem that the LET&D did not have all the prerequisite state and federal permits in hand by July 3, 1986. (See fn. 6 above). Budget commitments were not the only requirement that were missing for the LET&D. The DOE did not obtain a Permit to Construct an Air Pollution Facility (PTC) from the State of Idaho until 1999! Contractual commitments or continuous onsite physical construction are in addition to the requirement to have all state and federal permits. (See fn. 6 above). EPA’s comment that the LET&D “is on the permit track at this time” is a gloss over the fact that EPA/IDEQ allowed operation of the LET&D without any legal basis for interim status and without a permit. The HLLWE evaporator was likewise operated without a legal basis for interim status.
EPA’s 7/1/02 letter claims that “The approved [TAN] closure plan called for the removal and proper management of all hazardous waste in TAN 726 and 726A to achieve clean closure of the units. The waste was treated and the units decontaminated.” However EPA continues to provide no specific documentation that the 26,000+ gallons of radioactive and chromium contaminated wastes were processed in a RCRA permitted and compliant treatment facility. EPA has demonstrably failed to credibly answer the Petitioners’ fundamental query as to the whether disposition of the TAN waste was treated and disposed pursuant to RCRA regulations. Additionally, the attachment to EPA’s 7/1/02 letter to Plaintiffs has no index, has repetitive attachment numbers/letters, and no indication as to the origin citation of many attachments, thus making any reasonable use of the attachments or logical means of locating specific information contained in the +500 pages therein problematic if not nearly impossible.
EPA
admits Petitioners are correct that the 1992 Consent Order (addressing a two
year old 1990 Notice of Noncompliance), could not confer interim status
upon the LET&D. Considering that
for the same reasons that the Consent Order could not confer legal status on
the LET&D, EPA nevertheless remains silent about the fact that the Consent
Order also did not confer interim status on the HLLWE. EPA is attempting to minimize the fact that
DOE, EPA and the Idaho DEQ simply chose to illegally operate these new
hazardous waste facilities without RCRA permits. EPA claimed with respect
to Attachment J (3/20/02 Response regarding #10) that “As part of the risk
assessment that was performed by DOE on the emissions from the NWCF, work was
performed to identify chemicals and the concentration of these chemicals that
made up the waste to be ineived: from chruser.svc.tds.net (chruser.svc.tds.net [204.246.1.38])
by smithers.svc.tds.net (8.9.3/8.9.3) with ESMTP id XAA03072
for NO Gimmick........REAL SCIENCE!
This amazing new =
product
works by simply taking 2 pills every day...
To order go to
here =
or call
626-440-1747 M to F 8:00am to 6:00pm Pacific standard ti=
me
ALL NATUR=
AL HERBAL
COMPLEX CAPSULE =
RESULTS MAY
VARY.
NOTE: Go to here to be r=
emoved. NO Gimmick........REAL SCIENCE!
This amazing new =
product
works by simply taking 2 pills every day...
To order go to
here =
or call
626-440-1747 M to F 8:00am to 6:00pm Pacific standard ti=
me
ALL NATUR=
AL HERBAL
COMPLEX CAPSULE =
RESULTS MAY
VARY.
NOTE: Go to here to be r=
emoved. NO Gimmick........REAL SCIENCE!
This amazing new =
product
works by simply taking 2 pills every day...
To order go to
here =
or call
626-440-1747 M to F 8:00am to 6:00pm Pacific standard ti=
me
ALL NATUR=
AL HERBAL
COMPLEX CAPSULE =
RESULTS MAY
VARY.
NOTE: Go to here to be r=
emoved. =
For
full details on our program and pay plan, call now toll-free:
------=_NextPart_XJDOCIXISZ--
From shane.brath@tdstelecom.com Thu Dec 6 23:44:40 2001
Received: from lowblow.svc.tds.net (lowblow.svc.tds.net [204.246.1.39])
by smithers.svc.tds.net (8.9.3/8.9.3) with ESMTP id XAA03796
for

![]()
![]()
![]()
![]()
![]()
![]()
![]()

![]()
Xerox FreeColorPrinters has been supplying high-speed, network color printers to qualified small businesses, schools and non-profits since 1999.
This RISK-FREE program makes it possible for organizations to produce high-end color brochures, reports and newsletters in-house. And, the per-page cost is significantly lower than printing on other printers or outsourcing the project.
If you participate in the program for three years, the printer is yours to keep. If the program is not right for you, you simply cancel and return the printer. Really, it's that easy.
Want to participate?
![]()
![]()
![]()
![]()
![]()
![]()
![]()
From nb9b4eckgcc@hotmail.com Thu Dec 6 23:46:58 2001
Received: from lowblow.svc.tds.net (lowblow.svc.tds.net [204.246.1.39])
by smithers.svc.tds.net (8.9.3/8.9.3) with ESMTP id XAA04248
for
SIMPLE PILL CAN INCREASE YOUR EJACULATION By 581%!!!
Increase
Ejaculation by almost 600%!
Increase Sex drive
Stronger Erections
Longer Lasting orgasms!
More Intense Orgasms
Shoot up to 13 feet!
New Medical break=
through
has now created a revolutionary herbal pill that is guar=
anteed
to increase your Semen and EJACULATION by almost 600% in=
just
a few short weeks!
Simply try these =
Amazing
pills for 30-days and if after 30-days you do not experi=
ence
both a huge increase in the amount of semen you ejaculat=
e
along with longer lasting more intense orgasms, simply s=
end
the empty bottle back to us and we'll refund you 100% of=
the
cost including shipping. With this guarantee, our produc=
t must
work for you... or we'll lose money on every sale!
-Winner o=
f the
BURDETT RESEARCH "GOLDEN STAR" AWARD-<=
/font>
From sqwd@aol.com Fri Dec 7 00:03:45 2001
Received: from lowblow.svc.tds.net (lowblow.svc.tds.net [204.246.1.39])
by smithers.svc.tds.net (8.9.3/8.9.3) with ESMTP id AAA05106
for
SIMPLE PILL CAN INCREASE YOUR EJACULATION By 581%!!!
Increase
Ejaculation by almost 600%!
Increase Sex drive
Stronger Erections
Longer Lasting orgasms!
More Intense Orgasms
Shoot up to 13 feet!
New Medical break=
through
has now created a revolutionary herbal pill that is guar=
anteed
to increase your Semen and EJACULATION by almost 600% in=
just
a few short weeks!
Simply try these =
Amazing
pills for 30-days and if after 30-days you do not experi=
ence
both a huge increase in the amount of semen you ejaculat=
e
along with longer lasting more intense orgasms, simply s=
end
the empty bottle back to us and we'll refund you 100% of=
the
cost including shipping. With this guarantee, our produc=
t must
work for you... or we'll lose money on every sale!
-Winner o=
f the
BURDETT RESEARCH "GOLDEN STAR" AWARD-<=
/font>

go to www.gilbertstime.com to see his Unique Qualification
To be removed from this mailing list
send an email to mlxxout@yahoo.com
with "remove" in the subject line
From mwnvtpnio3@hotmail.com Fri Dec 7 00:14:17 2001
Received: from lowblow.svc.tds.net (lowblow.svc.tds.net [204.246.1.39])
by smithers.svc.tds.net (8.9.3/8.9.3) with ESMTP id AAA05408
for
From dns@dnsadmin.cw.net Fri Dec 7 00:37:15 2001
Received: from lowblow.svc.tds.net (lowblow.svc.tds.net [204.246.1.39])
by smithers.svc.tds.net (8.9.3/8.9.3) with ESMTP id AAA06694
for
SIMPLE PILL CAN INCREASE YOUR EJACULATION By 581%!!!
Increase
Ejaculation by almost 600%!
Increase Sex drive
Stronger Erections
Longer Lasting orgasms!
More Intense Orgasms
Shoot up to 13 feet!
New Medical break=
through
has now created a revolutionary herbal pill that is guar=
anteed
to increase your Semen and EJACULATION by almost 600% in=
just
a few short weeks!
Simply try these =
Amazing
pills for 30-days and if after 30-days you do not experi=
ence
both a huge increase in the amount of semen you ejaculat=
e
along with longer lasting more intense orgasms, simply s=
end
the empty bottle back to us and we'll refund you 100% of=
the
cost including shipping. With this guarantee, our produc=
t must
work for you... or we'll lose money on every sale!
-Winner o=
f the
BURDETT RESEARCH "GOLDEN STAR" AWARD-<=
/font>

CHANC=
E OF A
LIFETIME! INCREDIBLE HOME-BASED BUSINESS OPPORTUNITY!
EVERYONE wants it and we are the only ones who have it!=
span>
NO
COMPETITION WHATSOEVER! Easy to promote!
What we have is VERY powerful ...
YOU are definitely in the
RIGHT PLACE at the RIGHT TIME, RIGHT NOW!
=FF=
FFFF95
FREE TRAVEL
=FFFFFF95 Global Cash Card/Debit Card -- EVERYONE APPROVED =
-- no
questions asked!
=FFFFFF95 NO SECURITY DEPOSIT REQUIRED.
=FFFFFF95 Commissions paid WEEKLY -- soon to be DAILY!
=FFFFFF95 Tap into the HUGE "unbankable" market ...
Just think about this -- how many people would love to have access to getting a= cash card/debit card who, for whatever reasons, cannot get approved by any bank= ? Statistics show that in just the U.S. alone over 15% of people aren't even= able to get a checking account, let alone a debit card or a credit card; some c= annot even get secured credit, but they certainly deserve a chance to establish = or re-establish their credit. The reality is that bad things CAN and DO happe= n to GOOD people! Do you see the picture yet?
We
will share with you a simple 2-line phrase
that will literally mean that your phone will be ringing off the h=
ook,
and better yet, we will show you how to promote this very simply o=
n the
internet!
By
now I'm sure you've heard the saying about TIMING and POSITIONING =
being
EVERYTHING in LIFE??? This is one opportunity that I guarantee yo=
u will
NOT want to let slip by.
Now there=FFFFFF92s a very af=
fordable way
to turn your fantasies into reality. READ ON ...
To begin with we have a GLOBAL DEBIT CARD -- and, not just ANY global=
debit
card -- we have THE PREMIERE CARD issued by
the
SECOND LARGEST BANK IN THE U.S.A. and one of the TOP INTERNATIONAL BANKS I=
N THE
WORLD, assuring you UNMATCHED CREDIBILITY, SECURITY and RECOGNITION.<=
/span>
A global cash card/debit card that, indeed, is deliverable. Our company is
delivering the debit cards to new associates worldwide, EVERY SINGLE DAY b=
y
Federal Express delivery. Wherever your travels will take you in the world=
, this
card will provide you with instant access to your money in local currency,=
not
matter where you are, in over 150 countries worldwide. And, with our guida=
nce,
you can market this opportunity and the card as well as so much more in th=
ose
same countries, right from home.
By being an associate, you may withdraw funds from your account at automate= d teller machines (ATMs) or through transfers made at point-of-sale (POS) terminals that display the PLUS=FFFFFFAE, INTERLINK=FFFFFFAE and/or STAR= =FFFFFFAE network symbols as shown on the back of your card. You may also withdraw funds from your account at ATMs or through transfers at terminals that display any of th= e symbols shown in your How-to-Use Cardbook.
If
you think this is GREAT ... YOU'RE ABSOLUTELY RIGHT! But, there's EVE=
N more
..
What would you say if I said you can travel all over the United States and=
the
world for FREE?
Yes, you heard me! You and your family and friends can enjoy luxury cruise=
s,
resorts,
tours and much, much more. What if I could show you how to save hundreds o=
r even
thousands of dollars a year on travel and earn commissions at the same tim=
e?
REAP
THE SAME BENEFITS TRAVEL AGENTS ENJOY
Open the door to a new world of travel for you and your family. As a membe=
r of
the travel
profession, you are eligible to receive many discounts and courtesies that=
are
available
only to travel agents. Some of the benefits you may receive:
Why and how is this possible, you ask?
The only way cruise ships, new theme parks and tourist locations receive traff= ic is by inviting the travel agents first. By giving the travel agents VIP treat= ment and showing them unforgettable experiences, the agents will remember and r= efer their clients ... it's that simple!
Based
upon DEMAND, we are SUPPLYING =FFFFFF85 the most exciting part about our N=
EW travel
package, is the opportunity to get paid for sharing this with others. You =
read
this right! Get paid a GENEROUS commission for telling others while experi=
encing
incredible travel privileges from being an international travel agent.&nbs=
p;
EARN
EXTRA CASH BY WORKING AT HOME
More than $4 trillion a year is spent in the travel industry. Now you can =
start
earning your share by booking airlines, cruises, hotels, car rentals and o=
ur
packages. Because you will be working at home or traveling to gather pract=
ical
experience to support your travel business, you may also be eligible to sa=
ve
thousands of dollars in new tax deductions.
*Tax savings are based on your personal tax situation and will vary according t= o individual circumstances ... cons= ult your tax professional for further details.We are lookin= g for serious individuals who are looking to build a solid home-based business. Remember =FFFFFF85 we have something that NO ONE E= LSE HAS in a TRILLION DOLLAR+ INDUSTRY.&nbs= p;
WE
HAVE THE HOTTEST BUSINESS OPPORTUNITY IN THE WORLD!!!
EVERYONE WANTS IT AND WE HAVE IT!!!
For full details on our program and pay plan, call now toll-free
[7]The 1988 Clarification Rule required that “Facilities other than land disposal must submit Part B of the permit application in accordance with deadlines established by the EPA Regional Office.” The WCF-114 evaporator unit was not listed on the Part B application submitted by DOE in 1991.
[8]EPA claims that the ‘Director’ approved the HLLWE as a replacement for the WCF-114 under authority of 40 CFR 270.72(a)(2). However, there is no indication that the ‘Director’ made any of the necessary findings required by Section 270.72(a)(2) in the Part A application.
[9]Congress established a cutoff date for facilities operating under interim status to obtain a permit by November 8, 1992. 42 U.S.C. 6925 (c)(2)(C) states in pertinent part, “... Interim status under subsection (e) of this section shall terminate for each facility referred to in subparagraph (A) (ii) or (B) on the expiration of the five- or eight- year period referred to in subparagraph (A) or (B) whichever is applicable, unless the owner or operator of the facility applies for a final determination regarding the issuance of a permit under this subsection within - (i) two years after November 8, 1984 (in the case of a facility referred to in subparagraph (A) (ii), or (ii) four years after November 8, 1984 in the case of a facility referred to in subparagraph (B).” (Emphasis supplied).
[11]Criminal penalties are available under RCRA for knowingly treating, storing or disposing of any hazardous RCRA waste without a permit or in knowing violation of interim status requirements and other conditions. 42 U.S.C. §6928(d). Knowing endangerment exists where a person knows his conduct places another person in imminent danger of death or serious bodily injury, including circumstantial evidence that the defendant took affirmative steps to shield himself from relevant information. 42 U.S.C. §6928(e).